Akta headerlogo

Paket Tender


480 KM + PDV / godišnje

Saznajte više

Paket Tender


480 KM + PDV / godišnje

Saznajte više

Objavljeno: 26.10.2021 11:21

Izvor: Akta.ba, 26.10.2021

(pretkvalifikacija) Nabavka konsultantskih usluga za izradu studije izvodljivosti i usluga implementacionog konsultanta (opcija), za projekat Izgradnja fotonaponske elektrane Podveležje

JP ELEKTROPRIVREDA BOSNE i HERCEGOVINE d.d. SARAJEVO

 

Sarajevo, 26.10.2021

 

OBAVJEŠTENJE O OBJAVI

POZIVA ZA PRETKVALIFIKACIJU

 

JP ELEKTROPRIVREDA BOSNE i HERCEGOVINE d.d. SARAJEVO, obavještava zainteresovane kompanije da je Njemačka Razvojna Banka (KfW), dana 25.10.2021.godine, objavila Poziv za pretkvalifikaciju za konsultantske usluge „Izrada studije izvodljivosti i usluge Implementacionog konsultanta (opcija)", za projekat „Izgradnja fotonaponske elektrane Podveležje"

 

Kompletan tekst Poziva za pretkvalifikaciju je objavljen na web stranici: https://www.gtai.de/gtai-en/trade/tenders/bosnia-and-herzegovina/consulting-services-renewable-energy-solar-pv-feasibility-study-implementation-consultancy-728986

 

Consulting Services, Renewable Energy / Solar PV / Feasibility Study / Implementation Consultancy

Prequalification

Oct 25, 2021

 

  • Country Bosnia and Herzegovina
  • Deadline Nov 25, 2021
  • Financing KfW Entwicklungsbank
  • Reference Number  BMZ595000641/KfW507570
  • SubjectPhotovoltaic Power Plant (PVPP) Podveležje

 

Project:

The German Financial Cooperation through KfW intends to provide financing for the greenfield 36 MW Photovoltaic Power Plant Podveležje (the “Project”) which shall provide estimated 8 MW for the regional distribution network (Photovoltaic Power Plant Podveležje 1) and estimated 28 MW (and max. 30 MW) for the national transmission grid. The Project will be located in the immediate vicinity of the recently commissioned Wind Power Plant (WPP) Podvelezje of the Employer on the Plateau of Podvelezje at an altitude of between 700 and 800 meters. The Project will further promote renewable energy (RE) sources in the power generation portfolio of the BiH by exploiting the abundant solar energy potential in BiH.

R

equested Consulting Services:

  • Review existing studies and surveys
  • Prepare a technical feasibility study including review of preliminary design of the plant prepared by the Employer
  • Conduct a cost-benefit analysis
  • Supplement the ESIA in accordance with the KfW Sustainability Guideline / WB ESF and
  • Communication & Visibility activities